WELCOME
Welcome to the Project Lead The Way (PLTW) 2010-2011 Purchasing Manual webpage. Please find the following Instructions and associated program workbooks to inventory and order necessary supplies for your PLTW classes. The purchasing manual has been completely redesigned as of February 2010, so please take note of the changes. Whether you are a returning PLTW school or this is your first implementation, we strongly encourage you to read the entire set of instructions.
Please see the ADDITIONAL RESOURCES section at the end of this page for an explanation of our terminology and abbreviations.
NAVIGATING THE NEW PURCHASING MANUAL
The below is a summary of our instructions. We strongly recommend you read the full document.
2010-2011 PURCHASING MANUAL INSTRUCTIONS
We strongly recommend you review the new Instructions closely to guide you through the process.
| Description | Download |
|---|---|
| Purchasing Manual Instructions |
2010 PURCHASING MANUAL WORKBOOKS
The Excel files below contain all items necessary for PLTW’s three programs. The difference between a Program Workbook and a Vendor Workbook is explained in the Instructions.
| Program | Program Workbook | Vendor Workbook |
|---|---|---|
| Biomedical Sciences (BMS) High School Biomedical Program |
BMS Workbook | BMS Vendor |
| Gateway To Technology (GTT) Middle School Engineering Program |
GTT Workbook | GTT Vendor |
| Pathway To Engineering (PTE) High School Engineering Program |
PTE Workbook | PTE Vendor |
| Fischertechnik® |
Fischertechnik | |
2010 KEY COURSE SPECIFIC UPDATES
The PLTW curricula for several courses/units has been revised. Also, the review and redesign of the entire purchasing manual has resulted in changes to materials for nearly every course/unit. Details for each can be found at the top of the course/unit specific worksheet; however, we encourage you to review all requirements closely.
| Biomedical Sciences (BMS) | |
|---|---|
| Since the entire Purchasing Manual has been redesigned, we recommend that you review all the materials listed in the course worksheets for any updates/changes to the required materials. | |
| PBS | See above. |
| HBS | See above. |
| MI | See above. |
| BI | This course will be released during the summer of 2010. The purchasing information for the course will be available in May. |
| Gateway To Technology (GTT) | |
|---|---|
| The entire GTT Program has been revised and the new curriculum will be released in Summer 2010. Each unit worksheet reflects all of the materials needed to support the new curriculum. Due to the expanse of the redesign, you should review the materials required for every unit. | |
| DM | See above. |
| AR | See above. |
| EE | This is a new unit called Energy and the Environment. |
| FS | See above. |
| ST | See above. |
| ME | See above. |
| Pathway To Engineering (PTE) | |
|---|---|
| IED | There are no IED curriculum revisions for the 2010-11 school year. |
| POE | The POE curriculum has been revised and will be released during the summer of 2010. To support the new curriculum, the fischertechnik® POE kit, which has been a core element of this course, now requires pneumatics and alt energy components. It is imperative that you read the critical information, highlighted in yellow, at the top of the POE worksheet to determine if you need to purchase any associated upgrade kits. Please review the items on the worksheet closely to ensure you have all other materials needed to support the course revisions. |
| DE | The curriculum for DE was updated and released for the 2009-2010 school year. If you did not update your equipment last year to support the new DE curriculum, we strongly recommend you review the list of items on the DE worksheet carefully to be sure you have what you need. | AE | There are no AE curriculum revisions for the 2010-2011 school year; however, there are a still a few changes to the items required due to availability, so please review the list of items on the AE worksheet closely. |
| BE | There are no BE curriculum revisions for the 2010-2011 school year; however, there are a still a few changes to the items required due to availability, so please review the list of items on the BE worksheet closely. |
| CEA | The CEA curriculum has been revised and will be released during the summer of 2010. Please review the items on the CEA worksheet closely to ensure you have what is needed to support the course. |
| CIM | The CIM curriculum has been revised and will be released during the summer of 2010. To support the new curriculum, the fischertechnik® POE kit, which has been a core element of the CIM course (in addition to the POE course), now requires pneumatics components. It is imperative that you read the critical information, highlighted in yellow, at the top of the CIM worksheet to determine if you need to purchase any associated upgrade kits. Please review the items on the worksheet closely to ensure you have all other materials needed to support the course revisions. |
| EDD | Please see the EDD worksheet. |
ADDITIONAL RESOURCES
As resources are made available to assist schools in the purchasing process, they will be posted here.
| Description | Download |
|---|---|
| Purchasing Manual Terminology and Abbreviations | |
| Autodesk Software Reference Sheet | |
| Software Table | |
| Computer Specifications | |
| Technical Support Note: IT representatives may log into the Virtual Academy as a guest to access this resource. |
Link to PLTW Virtual Academy: http://www.pltw.org/moodle |
| 2010-11 Software Lease Agreement | Coming Spring 2010 |
| Text and Resources | Coming Spring 2010 |
This redesign is intended to make the inventory and ordering process faster and easier. We look forward to hearing from you as you use the new format. Please contact us with any thoughts, concerns, or questions by email at pmfeedback@pltw.org.